All nature of work is undertaken by H&H and after receiving a call from a local fisherman, we undertook a low budget job to provide a small panel to replace an existing re-fridge panel that was no longer working and very outdated. Keeping costs down we kept it basic but still provided a high level […]
Monthly Archives: August 2018
H&H were contacted by KML marine contractors to design, build and install a complete electrical dual thruster system. The system was required to interact with an intelligent positioning system which would keep the barge in position during strong tidal conditions. It was a modular design so this enabled the system to be moved from one […]
Working with the Quantum management team who designed the two 350Kva Gen sets, H&H undertook the installation job involving the build of the 4 panels. Each enclosure housing 2 panels, a switchboard panel and a control panel The generators were commissioned at Quantum and were tested on a load bank with both generators talking and […]
This is the second project that we have been commissioned to do for Gravity Mining. Their brief was to design, build and install 4 control panels that would be used to operate centrifugal mineral separators for a contract that they had with the Peruvian mining company, Minsur. The Panels were built at our workshop before […]
H&H Power and Control were commissioned by IMERYS to design and build a new control chair for a ship loader on Fowey river. We used Allen Bradley remote I/O units with the clients instructions so they could communicate with the infrastructure already in place on the site.
H&H Carried out the complete design and installation on this fantastic new fishing vessel the Pelagic Marksman. It has 2 generators with switchboards, battery systems with switchboards, navigation, bilge, electronics and main engine controls. The vessel was completely wired and commissioned from start to finish in three months.
We received an emergency call out to the MV FORTE which was anchored off Falmouth and reporting issues with the UPS system. On attending the vessel, we identified the problems and then installed new control boards. We recommissioned the system and ensured correct operation so that the vessel was able to depart Falmouth immediately and […]